Foothill-De Anza Community College District
Measures G and C
2021-2022 Annual Report
Citizens' Bond Oversight Committee
Citizens' Bond Oversight Committee
Letter from Committee Chair
March 7, 2023
To: The Board of Trustees and Residents of the Foothill-De Anza Community College District
The Citizens’ Bond Oversight Committee (the “Committee”) is pleased to present its annual report on the progress of the Foothill-De Anza Community College District’s two general obligation bond programs. In June 2006, the voters demonstrated their confidence in the district and passed Measure C, a $490.8 million general obligation bond initiative. In March 2020, the voters again supported the district by passing Measure G, an $898 million bond initiative.
The principal duties of the Committee include informing the public about the expenditure of Measure G and C bond proceeds; ensuring that the district spends bond money only for the purposes set forth in both measures; and producing an annual report of the Committee’s proceedings and activities, including a compliance statement. In contrast, the Board of Trustees’ responsibilities include but are not limited to overseeing the bond program, maintaining the list of authorized bond projects, prioritizing projects, and monitoring progress and spending on individual projects, and overseeing the annual performance and financial audits.
Funding provided by our community through Measures G and C is an indispensable investment in supporting student success. Maintaining Foothill and De Anza colleges and the Sunnyvale Education Center as valuable community resources ensures that the district can continue to provide community members with affordable, quality education and training and retraining opportunities that lead to higher-paid higher-skilled jobs while meeting regional workforce needs.
The Citizens’ Bond Oversight Committee met three times during the fiscal year to review Measure G and C activities. At these meetings, district and program management staff provided the committee with written and oral reports and presentations, including:
- Measures G and C General Obligation Bond Program Planning Update
- Measure G Quarterly Summary Reports
- Measure C Quarterly Summary Reports
- Measure G Bond List Revision Reports
- Measure C Bond List Revision Reports
- Staff Reports
In addition to its meetings with the Foothill-De Anza staff to review Measures G and C-related activities, the Committee relied on the annual independent performance and financial audits conducted by Clifton, Larson, and Allen, LLP (the “Auditor”) and an oral presentation by the Auditor to carry out its duties.
The Auditor concludes: "The results of our tests indicated that, in all significant respects, the District expended Measure C, June 2006 and Measure G, March 2020 General Obligation bond funds for the fiscal year ended June 30, 2022, only for the specific projects developed by the District’s Board of Trustees, and approved by the voters, in accordance with the requirements of Proposition 39, as specified by Section 1(b)(3)(C) of Article XIIIA of the California Constitution (page 14)."
The Auditor also concludes "The results of our tests indicated that, in all significant respects, the District has properly accounted for the expenditures of the funds held in the Measure C, June 2006 and Measure G, March 2020 bond funds and that such expenditures were made on authorized bond projects."
In conclusion, based on the meetings with and reports from staff, and the reports from the Auditor, the Committee concludes that, to the best of its knowledge, Measure G and C bond funds have been spent only on authorized Measure G and C bond projects developed by the District’s Board of Trustees and approved by the voters. The performance and financial audits can be viewed here.
Very truly yours,
Bruce Tolley
Committee Chair
Committee Members
Citizens’ Bond Oversight Committee members are appointed by the Board of Trustees. The following members were active during the past fiscal year:
- Joan Barram, Bona-fide Taxpayers Organization Representative
- Nancy Bremeau, Business Organization Representative
- Marge Bruno, Senior Citizens’ Organization Representative
- Ty Conner, At-Large Representative
- Amine Khechfé, Foothill-De Anza Support Organization Representative
- Bruce Tolley, At-Large Representative
Committee Meetings
The committee meets on a quarterly basis, with meetings open to the public. For a listing of meetings and proceedings please visit the committee meeting page.
About Measure G
On March 3, 2020, voters in the district’s service area approved Measure G, a $898 million general obligation bond measure, enabling the district to:
- Upgrade facilities preparing students/veterans for university transfer and careers in fields such as healthcare, nursing, technology, engineering/sciences
- Upgrade and repair aging classrooms as well as labs for science, technology, engineering/math-related fields of instruction
- Acquire, construct, repair facilities, equipment and sites
Read the full Measure G Ballot Language here
About Measure C
On June 6, 2006, voters in the district’s service area approved Measure C, a $490.8 million general obligation bond measure, enabling the district to:
- Upgrade electrical, heating, ventilation, and fire/seismic safety systems
- Repair leaky roofs
- Improve access for people with disabilities
- Repair/expand classrooms for nurses/paramedics
- Upgrade technology
- Repair, construct, acquire, and equip buildings, classrooms, libraries, sites, science/computer labs
Measure G Bond Expenditures
as of June 30, 2022
| Location | Total Budget | Fiscal Year Expenditures | Program Expenditures to date |
|---|---|---|---|
| Foothill College | $175,630,000 | $10,304 | $10,304 |
| De Anza College | $175,703,000 | $177,653 | $177,653 |
| Central Services | $20,000,000 | $0 | $0 |
| Educational Technology Services | $100,000,000 | $2,293,617 | $2,293,617 |
| District | $427,455,908 | $1,457,747 | $28,319,813 |
| Total: | $898,788,908 | $3,939,321 | $30,801,388 |
| Rounding factors may apply. Includes interest received and accrued as of June 30, 2022 Source Documents: Quarterly Summary Report - BoardDocs | |||
Measure G Top 5 Projects by Fiscal Year Expenditures
- Educational Technology Services (ETS) - Refresh Academic and Business Computer - $1,378,363
Project Scope: Provide students, faculty, and staff with advanced computing tools (i.e. desktops, laptops, tablets) for academic and business purposes.
- Educational Technology Services (ETS) - Network Upgrades and Enhancements - $887,145
Project Scope: Maintain and continuously upgrade the wired and wireless networks throughout the district to provide students, faculty, staff, and visitors with secure and robust Internet connectivity. - District-Wide - Program Overhead - $797,787
Project Scope: Management, cost of issuance, legal, district office labor, program planning, and assessments. - District-Wide - De Anza Event Center and Utility Relocation - $534,538
Project Scope: Construct new De Anza Event Center. This project to include the planning for and relocation of existing utilities, demolition of Flint Center, site preparations, and the construction of the new facility and all of its utilities. - De Anza College - New Services for Students Building - $176,367
Remove and replace original Creative Arts Quad buildings to better serve student needs and replacement of Physical Plant building attached to Flint Center and Creative Arts Quad buildings. Includes Heating, Ventilation and Air Conditioning (HVAC) system and electrical distribution replacement.
Measure G Bond Project List
as of June 30, 2022
| Project Name | Budget | Expenditures to Date | Budget Remaining |
|---|---|---|---|
| Foothill College | |||
| Upgrade Restrooms to Gender Neutral | $688,300 | $10,304 | $677,996 |
| Renovate Football Stadium East Bleachers | $1,376,600 | $0 | $1,376,600 |
| Modernization Campus Wide Building Exteriors - FH | $27,532,700 | $0 | $27,532,700 |
| Improve ADA Pathways to Outdoor Classroom | $688,300 | $0 | $688,300 |
| Modernize and Expand Student Success Centers | $2,753,300 | $0 | $2,753,300 |
| Upgrade Infrastructure and HVAC Systems - FH | $61,948,700 | $0 | $61,948,700 |
| Swing Space | $1,376,600 | $0 | $1,376,600 |
| Infrastructure and Distribution Piping Improvements Heating, Ventilation and Air Conditioning Upgrades Campus-wide | $0 | $0 | $0 |
| Renovate and Upgrade Existing Classroom Facilities | $1,652,000 | $0 | $1,652,000 |
| Pool and Physical Educational Facilities Improvements | $16,519,600 | $0 | $16,519,600 |
| Site Improvements | $12,389,800 | $0 | $12,389,800 |
| Site Access, Signage and Wayfinding Improvements Campus-wide | $15,831,400 | $0 | $15,831,400 |
| Lighting Improvements Campus-wide | $2,753,300 | $0 | $2,753,300 |
| Natural Gas Service and Distribution and Electrification | $5,506,600 | $0 | $5,506,600 |
| Electrical Systems Renovations and Upgrades Campus-wide | $13,766,500 | $0 | $13,766,500 |
| Building Management System Upgrades Campuswide | $2,064,900 | $0 | $2,064,900 |
| Campus Contingency (Foothill) | $8,781,400 | $0 | $8,781,400 |
| Foothill College Total: | $175,630,000 | $10,304 | $175,619,696 |
| De Anza College | |||
| Upgrade Fire Alarms and Supression Systems | $4,818,400 | $0 | $4,818,400 |
| New Services for Students Building | $64,703,600 | $176,367 | $64,527,233 |
| Modernization Campus Wide Building Exteriors - DA | $20,650,100 | $0 | $20,650,100 |
| Convert Existing Facility to Beach Volleyball | $2,065,000 | $0 | $2,065,000 |
| Upgrade Infrastructure and HVAC Systems - DA | $34,416,900 | $0 | $34,416,900 |
| Modernize Building Interior and Exteriors | $5,506,700 | $1,286 | $5,505,414 |
| Site Improvements | $5,506,700 | $0 | $5,506,700 |
| Perimeter Campus Roadway, Pathway and Traffic Improvements | $6,883,400 | $0 | $6,883,400 |
| Signage and Wayfinding Improvements Campuswide | $1,376,700 | $0 | $1,376,700 |
| Swing Space | $1,376,700 | $0 | $1,376,700 |
| Infrastructure and Distribution Piping Improvements Heating, Ventilation and Air Conditioning Upgrades Campus-wide | $0 | $0 | $0 |
| Physical Plant replacement attached to Flint Center and Creative Arts Quad Buildings | $0 | $0 | $0 |
| Furniture, Fixtures and Equipment | $6,883,400 | $0 | $6,883,400 |
| Student Health Services Renovation | $2,065,000 | $0 | $2,065,000 |
| Physical Education Gymnasium Building Renovations | $1,376,600 | $0 | $1,376,600 |
| Pool and Physical Educational Quad Facilities Improvements | $8,260,100 | $0 | $8,260,100 |
| Automotive Technology Facilities Improvements and Modernization | $1,032,500 | $0 | $1,032,500 |
| Campus Contingency (De Anza) | $8,781,200 | $0 | $8,781,200 |
| De Anza College Total: | $175,703,000 | $177,653 | $175,525,347 |
| Central Services | |||
| Upgrade Security Systems | $13,000,000 | $0 | $13,000,000 |
| Equipment and Vehicles Acquisitions | $3,000,000 | $0 | $3,000,000 |
| ETS Storage Facilities | $3,000,000 | $0 | $3,000,000 |
| Central Services Contingency | $1,000,000 | $0 | $1,000,000 |
| Central Services Total: | $20,000,000 | $0 | $20,000,000 |
| Educational Technology Services (ETS) | |||
| Upgrade Learning Space Tech - FH | $13,865,081 | $10,422 | $13,854,659 |
| Upgrade Learning Space Tech - DA | $13,978,098 | $14,817 | $13,963,281 |
| Upgrade Meeting Room Space Tech - CS | $807,820 | $0 | $807,820 |
| Refresh Academic and Business Computer | $26,389,200 | $1,378,363 | $25,010,837 |
| Server and Disk Storage Systems | $2,262,000 | $2,870 | $2,259,130 |
| Network Upgrades and Enhancements | $15,079,300 | $887,145 | $14,192,155 |
| Upgrades to Network Service Rooms | $11,309,700 | $0 | $11,309,700 |
| IT Security Upgrades and Enhancements | $7,539,200 | $0 | $7,539,200 |
| Upgrade Voice Communication Systems | $3,769,600 | $0 | $3,769,600 |
| Educational Technology Services (ETS) Contingency | $5,000,000 | $0 | $5,000,000 |
| Learning Space Technology Upgrades and Enhancements | $0 | $0 | $0 |
| Assistive Listening Devices for Hearing Impaired Individuals | $0 | $0 | $0 |
| Educational Technology Services (ETS) Total: | $100,000,000 | $2,293,617 | $97,706,383 |
| District | |||
| Program Overhead | $43,621,938 | $940,907 | $42,681,031 |
| Refinance Flint Center Parking Garage | $25,055,632 | $25,055,632 | $0 |
| Renovate Carriage House | $1,827,100 | $112,464 | $1,714,636 |
| De Anza Event Center and Utilities Relocation | $0 | $0 | $0 |
| Relocate Utilities DA Event Center | $0 | $0 | $0 |
| De Anza Event Center and Utility Relocation | $101,728,800 | $534,538 | $101,194,262 |
| Structural Upgrade Griffin House | $5,444,200 | $298,210 | $5,145,990 |
| Cost of Issuance | $1,378,062 | $1,378,062 | $0 |
| District-wide Contingency | $14,970,084 | $0 | $14,970,084 |
| District-wide Energy and Sustainability Projects | $12,718,300 | $0 | $12,718,300 |
| Employee and Student Housing | $200,000,000 | $0 | $200,000,000 |
| Program Catastrophic Contingency | $20,353,000 | $0 | $20,353,000 |
| Unallocated Interest Earnings | $358,792 | $0 | $358,792 |
| District Total: | $427,455,908 | $28,319,813 | $399,136,095 |
| Measure G Total: | $898,788,908 | $30,801,388 | $867,987,520 |
Measure C Bond Expenditures
as of June 30, 2022
| Location | Total Budget | Fiscal Year Expenditures | Program Expenditures to date |
|---|---|---|---|
| Foothill College | $206,573,068 | $201,537 | $200,892,471 |
| De Anza College | $221,424,562 | $2,480,833 | $216,940,637 |
| District | $99,603,265 | $111,216 | $97,689,739 |
| Total: | $527,600,895 | $2,793,587 | $515,522,847 |
| Rounding factors may apply. Includes interest received and accrued as of June 30, 2022. Source Documents: Quarterly Summary Report - BoardDocs | |||
Measure C Top 5 Projects by Fiscal Year Expenditures
- De Anza College - Re-roof Science Buildings SC1 & SC2 - $1,044,440
Project Scope: Remove and replace existing flat roof materials, associated roof penetration flashings, and equipment pad flashings for the De Anza College Science buildings SC1 and SC2. Repair and/or replace damaged underlayment, install new insulation as needed and any equipment piping supports required, and install new single ply roofing.
- De Anza College - Furniture Refresh for Students, Faculty, Staff and Administrators - $737,019
Project Scope: Ongoing project to systematically refresh student/staff/faculty/administrative offices and other student use spaces on campus. Furniture purchases include but are not limited to desks, tables, chairs and cabinets. Timeline is ongoing through the remaining life of the bond. - De Anza College - Outdoor Furniture Update and Refresh - $290,852
Project Scope: Refresh outdoor furniture that is significantly dated or no longer exists with more appropriate models that will better fit student needs as well as provide maintenance utility for the staff. Timeline is ongoing through the remaining life of the bond. - De Anza College - Campus Center Floors Improvement - $142,088
The project is an interior renovation of an existing tenant space. The scope of work includes - but is not limited to - modifications to interior flooring and wall base, as well as thresholds and transitions as required to maintain compliance with accessibility codes. Contractor will be responsible for preparing all areas for new work including patching and repairing existing conditions that were affected by demolition work. The work to be performed in this project includes the furnishings of all labor, materials, equipment, transportation, services, permits, temporary controls, construction facilities, seismic requirements, general project requirements and incidentals required to complete the work on the project in its entirety as described in the contract documents. - Foothill College – Desktops - $128,305
Measure C Bond Project List
as of June 30, 2022
| Project Name | Budget | Expenditures To Date | Budget Remaining |
|---|---|---|---|
| Foothill College | |||
| Board Approved | |||
| Sunnyvale Ed Center HVAC System Replacement and Classroom Renovation | $5,680,597 | $0 | $5,680,597 |
| Closeout | |||
| Furniture and Equipment (Excluding Tech Related Equipment) Foothill | $11,705,554 | $11,705,554 | $0 |
| Desktops | $6,447,933 | $6,447,933 | $0 |
| New Multi Media, Then Refresh | $4,039,132 | $4,039,132 | $0 |
| Complete | |||
| Small Capital Repairs - Foothill | $3,811,411 | $3,811,411 | $0 |
| Building 1500 Renovation | $1,174,660 | $1,174,660 | $0 |
| PE Reroofing | $976,594 | $976,594 | $0 |
| Irrigation Pump Replacement | $258,260 | $258,260 | $0 |
| Building 2500 Reroof | $969,180 | $969,180 | $0 |
| Forum | $3,912,855 | $3,912,855 | $0 |
| Modernization of Learning Support Center, Biology and General Classrooms | $16,203,253 | $16,203,253 | $0 |
| Modernization of Building 5700 | $361,698 | $361,698 | $0 |
| Physical Education Lab Space | $1,512,408 | $1,512,408 | $0 |
| LA General Classrooms | $3,064,580 | $3,064,580 | $0 |
| Swing Space | $965,079 | $965,079 | $0 |
| Modernization of Administration Building & General Classrooms | $7,132,515 | $7,132,515 | $0 |
| Reconstruction of Stadium Bleachers & Press Box | $1,816,465 | $1,816,465 | $0 |
| Fine Arts Scene Shop | $767,347 | $767,347 | $0 |
| Japanese Cultural Center | $120,234 | $120,234 | $0 |
| Renovate Existing Footbridge | $253,693 | $253,693 | $0 |
| Storage Bldg at Swim Pool Area | $536,837 | $536,837 | $0 |
| Smithwick Theater | $4,139,185 | $4,139,185 | $0 |
| Library & ISC | $15,131,676 | $15,131,676 | $0 |
| Campus Wide Building System & Infrastructure Repairs/Upgrades | $620,727 | $620,727 | $0 |
| Mainline Irrigation - Phase II | $158,942 | $158,942 | $0 |
| Utility Lids - Phase II | $572,116 | $572,116 | $0 |
| Loop Road Resurfacing | $1,012,739 | $1,012,739 | $0 |
| Exterior Signage | $351,451 | $351,451 | $0 |
| Utility and Technology Infrastructure | $8,515,900 | $8,515,900 | $0 |
| Exterior Painting & Bird Remediation | $621,983 | $621,983 | $0 |
| Soccer and Softball Complex | $4,077,771 | $4,077,771 | $0 |
| Central Campus Site Improvements | $9,809,110 | $9,809,110 | $0 |
| Ornamental Horticulture & Veterinary Technology Demo. | $182,567 | $182,567 | $0 |
| Choral Rehearsal Hall | $150,002 | $150,002 | $0 |
| Dental Hygiene/Radiology Renovation | $254,814 | $254,814 | $0 |
| Install Photovoltaic Arrays - Campus Wide | $11,738,853 | $11,738,853 | $0 |
| Physical Sciences and Engineering Center | $57,627,320 | $57,627,320 | $0 |
| Group II Equip | $1,073,647 | $1,073,647 | $0 |
| Fire Alarm System Replacements Phase II | $1,576,697 | $1,576,697 | $0 |
| Parking and Circulation | $13,468,168 | $13,468,168 | $0 |
| Environmental Impact Report | $282,730 | $282,730 | $0 |
| Print Shop and Plant Services Facility | $287,833 | $287,833 | $0 |
| Fire Alarm System Replacement Phase III | $900,374 | $900,374 | $0 |
| Repair and Upgrade Miscellaneous Projects | $451,424 | $451,424 | $0 |
| Upgrade Doors and Hardware | $40,247 | $40,247 | $0 |
| Outdoor and Indoor Student Seating (PSEC Café, 5000, 5100, 5400, etc.) | $13,440 | $13,440 | $0 |
| Faculty/Staff/Administrator Office Refresh (Furniture) | $15,311 | $15,311 | $0 |
| Classroom Furniture Replacement | $35,717 | $35,717 | $0 |
| Printers | $82,325 | $82,325 | $0 |
| Refresh Multi Media Rooms | $1,152,489 | $1,152,489 | $0 |
| AV/Low Tech | $43,456 | $43,456 | $0 |
| Instructional Equipment for BH, FA & PE 18-19 | $146,942 | $146,942 | $0 |
| Consolidated | |||
| Biology | $0 | $0 | $0 |
| Convert to Adaptive Learning Center | $0 | $0 | $0 |
| General Classrooms | $0 | $0 | $0 |
| Language Lab | $0 | $0 | $0 |
| General Classrooms | $0 | $0 | $0 |
| Lot 2 & 3 Security Improvements | $0 | $0 | $0 |
| Tennis Court Improvements | $0 | $0 | $0 |
| TV Center | $0 | $0 | $0 |
| Loop Road Lighting & Safety | $11,033 | $11,033 | $0 |
| ADA Transition Plan | $1,203 | $1,203 | $0 |
| Lot 4 | $0 | $0 | $0 |
| Lot 6 | $11,459 | $11,459 | $0 |
| Complete Lot 1H | $0 | $0 | $0 |
| Exterior Lighting | $0 | $0 | $0 |
| Campus Fountains | $0 | $0 | $0 |
| Replace Storm Drains | $0 | $0 | $0 |
| Tree Maintenance and Replacement | $0 | $0 | $0 |
| Slurry Coat and Re-stripe Lots 2 & 3 | $0 | $0 | $0 |
| Widen Access Road to PE | $0 | $0 | $0 |
| Replace Walkways | $106,320 | $106,320 | $0 |
| Veterinary Technology | $0 | $0 | $0 |
| Wireless Infrastructure | $0 | $0 | $0 |
| Pedestrian Bridge Lot 1 | $0 | $0 | $0 |
| LA Division Office /Classrooms | $9,816 | $9,816 | $0 |
| Loop Road Re-Alignment & Pedestrian Safety Improv | $186,997 | $186,997 | $0 |
| Expansion of VDI Servers | $0 | $0 | $0 |
| Computer Equipment (Carts, Monitors) | $0 | $0 | $0 |
| Accommodation/Ergonomic Furniture & Equipment (Staff, Faculty and Administrators) | $0 | $0 | $0 |
| Accessibility Project for Classrooms and Labs (Counters, Tables, Desks, Chairs) | $0 | $0 | $0 |
| Contingency | |||
| Foothill Contingency | $0 | $0 | $0 |
| Foothill College Total: | $206,573,068 | $200,892,471 | $5,680,597 |
| De Anza College | |||
| Procurement | |||
| Student Lab ADA Accessibility Project | $211,653 | $11,651 | $200,002 |
| Furniture Refresh for Students, Faculty, Staff and Administrators | $3,638,943 | $2,475,200 | $1,163,743 |
| Outdoor Furniture Update and Refresh | $816,063 | $355,161 | $460,902 |
| System Wide Infrastructure | $638,704 | $168,256 | $470,448 |
| Design | |||
| Upgrade E3 Design & Manf Tech Labs | $1,549,194 | $131,701 | $1,417,493 |
| Closeout | |||
| Re-roof Science Buildings SC1 & SC2 | $1,466,401 | $1,466,401 | $0 |
| Campus Center Floors Improvement | $630,132 | $630,132 | $0 |
| Instructional Writing Surfaces Remediation | $224,292 | $224,292 | $0 |
| Desktops | $9,495,637 | $9,495,622 | $15 |
| Refresh Multi Media Rooms | $3,889,795 | $3,889,795 | $0 |
| Complete | |||
| Small Capital Repairs - De Anza | $3,174,620 | $3,174,620 | $0 |
| L-7 | $3,805,020 | $3,805,020 | $0 |
| Baldwin Winery & East Cottage "Historic Renovation" | $6,159,985 | $6,159,985 | $0 |
| Seminar Building & Multicultural Center | $5,000,053 | $5,000,053 | $0 |
| Stadium and Track | $7,976,644 | $7,976,644 | $0 |
| L-Quad Seating | $158,918 | $158,918 | $0 |
| Corporation Yard | $4,008,793 | $4,008,793 | $0 |
| Signage (Phase I) | $671,069 | $671,069 | $0 |
| Library | $11,152,379 | $11,152,379 | $0 |
| Secured Bicycle Storage for Students | $227,117 | $227,117 | $0 |
| Signage and Wayfinding | $830,762 | $830,762 | $0 |
| Campus Site Lighting (Phase I) | $662,686 | $662,686 | $0 |
| Campus Wide Electronic Locks | $1,537,277 | $1,537,277 | $0 |
| Campus Wide Replacement/Repair of Interior and Exterior Finishes | $1,259,670 | $1,259,670 | $0 |
| Window Replacement Campus-wide | $405,845 | $405,845 | $0 |
| CDC Playground Maintenance & Shade Structure | $439,291 | $439,291 | $0 |
| Environmental Studies Area | $972,869 | $972,869 | $0 |
| Repair Tile Roofs | $5,293,951 | $5,293,951 | $0 |
| Flint Parking Structure Repairs | $6,946,144 | $6,946,144 | $0 |
| S2- S6 Phase II - Utility Master Plan - Phase I | $14,822,225 | $14,822,225 | $0 |
| ATC | $11,631,949 | $11,631,949 | $0 |
| G-Building | $962,243 | $962,243 | $0 |
| Campus Drive | $3,669,717 | $3,669,717 | $0 |
| Install Photovoltaic Arrays - Campus Wide | $11,732,597 | $11,732,597 | $0 |
| Elevator Upgrades - Campus Wide | $733,108 | $733,108 | $0 |
| ATC Central Plant Sound Attenuation | $686,818 | $686,818 | $0 |
| Auto Technology | $4,064,329 | $4,064,329 | $0 |
| Campus Center Phase II | $2,156,931 | $2,156,931 | $0 |
| Media & Learning Center | $49,972,863 | $49,972,863 | $0 |
| Group II Equip | $1,900,378 | $1,900,378 | $0 |
| Swing Space | $1,238,195 | $1,238,195 | $0 |
| Fire Alarm System Replacements Phase II | $284,997 | $284,997 | $0 |
| Forum | $2,155,798 | $2,155,798 | $0 |
| EIR | $43,233 | $43,233 | $0 |
| Roof and Trellis Repair: PE 1-2-6 & S7 - 8 | $1,562,017 | $1,562,017 | $0 |
| Combined Site Improvements | $8,580,539 | $8,580,539 | $0 |
| L-7 Phase II | $2,566,379 | $2,566,379 | $0 |
| Campus Exterior Lighting | $553,579 | $553,579 | $0 |
| Planetarium Roof Replacement | $84,340 | $84,340 | $0 |
| Interior and Exterior Improvements | $323,766 | $323,766 | $0 |
| Furniture and Equipment (Excluding Tech Related Equipment) De Anza | $15,143,366 | $15,143,366 | $0 |
| Printers | $210,759 | $210,759 | $0 |
| New Multi Media, Then Refresh | $2,102,269 | $2,102,269 | $0 |
| AV/Low Tech | $17,683 | $17,683 | $0 |
| Consolidated | |||
| PE Quad Breezeway | $0 | $0 | $0 |
| Demolition of Staff House | $0 | $0 | $0 |
| Wireless Infrastructure- Phase II & III | $0 | $0 | $0 |
| Asphalt Walks | $0 | $0 | $0 |
| East Cottage "Historic Renovation" | $0 | $0 | $0 |
| Irrigation - Branches | $0 | $0 | $0 |
| Landscaping Phase II | $0 | $0 | $0 |
| Campus Exterior Lighting Phase II | $0 | $0 | $0 |
| Resurface Parking Lots E & I | $0 | $0 | $0 |
| Construct Parking Lot K | $0 | $0 | $0 |
| Sunken Garden | $0 | $0 | $0 |
| Slip Line Storm Drain Main Lines | $0 | $0 | $0 |
| Repair Stone Pavers in Court Yards | $0 | $0 | $0 |
| Slurry Seal Lots A, B, and Flint Center Parking Garage | $0 | $0 | $0 |
| L5 Central Plant | $0 | $0 | $0 |
| Baseball & Softball Fields | $0 | $0 | $0 |
| ADA Transition Plan | $0 | $0 | $0 |
| Construct New Covered Gathering Area | $0 | $0 | $0 |
| Financial Aid Outreach Office | $0 | $0 | $0 |
| Multicultural Center | $0 | $0 | $0 |
| Planetarium Expansion | $0 | $0 | $0 |
| Parking and Circulation | $0 | $0 | $0 |
| Cancelled | |||
| A8 | $190,936 | $190,936 | $0 |
| Phase II - Renovation of A9 | $0 | $0 | $0 |
| Master Landscaping (Phase I) | $0 | $0 | $0 |
| Renovation of Admin. Phase II | $0 | $0 | $0 |
| Construct New Transit Center | $18,319 | $18,319 | $0 |
| Contingency | |||
| De Anza Program Contingency | $771,321 | $0 | $771,321 |
| De Anza College Total: | $221,424,562 | $216,940,637 | $4,483,925 |
| District | |||
| Procurement | |||
| Server Growth | $205,787 | $185,270 | $20,517 |
| Wireless Infrastructure - Phase II & III | $968,536 | $876,112 | $92,424 |
| Desktops | $1,041,555 | $1,041,228 | $327 |
| Closeout | |||
| New District Offices | $22,288,808 | $22,288,808 | $0 |
| ETS Facilities | $1,461,144 | $1,330,519 | $130,625 |
| Network Room Renovation | $1,864,314 | $1,864,314 | $0 |
| Printers | $33,321 | $33,321 | $0 |
| Foothill-DeAnza Education Center | $41,031,817 | $41,031,817 | $0 |
| Complete | |||
| Phone Equipment | $2,297,540 | $2,297,540 | $0 |
| Network and Security | $4,722,637 | $4,722,637 | $0 |
| Consultants Spec Network Routers | $97,305 | $97,305 | $0 |
| Labor to Refresh Computers | $2,292,077 | $2,292,077 | $0 |
| Labor to Install Network Equipt/Routers etc | $510,094 | $510,094 | $0 |
| Replace ERP | $10,584,942 | $10,584,942 | $0 |
| ERP Hardware Refresh | $232,651 | $232,651 | $0 |
| Server Refresh | $1,994,653 | $1,994,653 | $0 |
| Wireless Infrastructure | $658,903 | $658,903 | $0 |
| District Vehicles | $3,194,909 | $3,194,909 | $0 |
| Group II Equip | $522,600 | $522,600 | $0 |
| Consolidated | |||
| Pay Off Existing Loan | $0 | $0 | $0 |
| Grounds and Landscaping | $0 | $0 | $0 |
| Repairs & Resurfacing of Roads & Parking | $0 | $0 | $0 |
| Data Center "C" | $128,415 | $128,415 | $0 |
| District Program Contingency - Property Acquisition | $0 | $0 | $0 |
| Pay Off Existing Debt | $0 | $0 | $0 |
| Program Overhead and Other | |||
| Pass through Account for OH Collection | $0 | $0 | $0 |
| Pass through Account for FET OH Collection | $0 | $0 | $0 |
| Program Overhead | $382,971 | $0 | $382,971 |
| Cost of Issuance/Other | $1,801,622 | $1,801,622 | $0 |
| Unallocated Interest Earnings | $31,867 | $0 | $31,867 |
| Whole Program Contingency | |||
| District Program Contingency | $1,254,795 | $0 | $1,254,795 |
| Catastrophic Contingency | $0 | $0 | $0 |
| District Total: | $99,603,265 | $97,689,739 | $1,913,526 |
| Measure C Total: | $527,600,895 | $515,522,847 | $12,078,048 |
Featured Projects
Completed, occupied or put in use this fiscal year
District Office Building

Location: District
Budget: $22,734,680
Fiscal Year Expenses: $141,193
Completion date: February 2021
The new District offices will benefit the staff and campus community by providing a centralized location for operational staff to perform their work. This centralized location maximizes public access to the various District departments for safe and secure interactions and minimizes travel between previously dispersed office locations. The public and students can more easily access the Board room for public meetings.
Parking and Circulation (Lot 5/6)

Location: Foothill College
Budget: $13,549,118
Fiscal Year Expenses: $53,810
Completion date: March 2021
The Parking Lot 5/6 project is a smaller project within the Parking and Circulation (162) main project. The Parking Lot 5/6 repair project benefits students and community by offering 189 additional parking spaces, improving accessibility with 14 new accessible parking spaces and providing 10 new Electric Vehicle (EV) Charging Stations to promote carbon reduction and sustainability.