The Measure C Citizens’ Bond Oversight Committee is pleased to present its annual report on the progress of the Foothill-De Anza Community College District’s $490.8 million general obligation bond initiative in the 2019-20 fiscal year.
The principal duties of the committee include informing the public about the expenditure of Measure C bond proceeds; ensuring that the district spends bond money only for the purposes set forth in Measure C; and producing an annual report of the committee’s proceedings and activities, including a compliance statement. The Board of Trustees’ responsibilities include overseeing the bond program, prioritizing projects, and monitoring progress and spending on individual projects, and overseeing the annual performance and financial audits.
During the 2019-2020 fiscal year, the district completed several important projects. At De Anza College, this included painting the interior of the Registration & Student Services Building. At Foothill College, the district completed renovations to the data room in Building 1900, which included replacement of the heating, ventilation and air conditioning systems and installation of new uninterruptable power supply systems for back-up power.
The New District Office Building containing the district’s administrative offices and Board Room was substantially completed and occupied in late February 2020, shortly before Santa Clara County implemented a shelter-in-place mandate to combat COVID-19. Due to this order, final work on the building has continued sporadically to comply with all county public health requirements.
Funding provided by our community through Measure C is an indispensable investment in supporting student success. Maintaining Foothill and De Anza colleges and the Sunnyvale Center as valuable community resources ensures that the district can continue to provide community members with affordable, quality education and training and retraining opportunities that lead to higher-paid, higher-skilled jobs while meeting regional workforce needs.
The Citizens’ Bond Oversight Committee met twice during the past fiscal year to review Measure C activities. At these meetings, district and program management staff provided the committee with written and oral reports and presentations, including:
- Measure C Quarterly Summary Reports
- Bond List Revision Reports
- An onsite tour of the New District Office Building
- Staff Reports
In addition to its meetings with the Foothill-De Anza staff to review Measure C-related activities, the committee relied on the annual independent performance and financial audits conducted by Clifton, Larson, and Allen, LLP to carry out its duties. The annual performance and financial audits disclosed no instances of non-compliance with the terms of Proposition 39 or Measure C. The committee wishes to report that, to the best of its knowledge, the expenditures charged to the Measure C General Obligation Bonds have been made in accordance with the bond project list approved by voters through the approval of Measure C on June 6, 2006. The performance and financial audits can be viewed here.
Very truly yours,
Bruce Tolley
Committee Chair
Committee Members
Citizens’ Bond Oversight Committee members are appointed by the Board of Trustees. The following members were active during the past fiscal year:
- Dudley AndersenAt-large representative
- Joan BarramAt-large representative
- Marge BrunoSenior citizens’ organization representative
- Kelly DavisSupport organization representative
- Dexter DawesTaxpayers’ association representative
- Amine KhechfeSupport organization representative
- Ellen SalibaAt-large representative
- Bruce TolleyBusiness organization representative
Committee Meetings
The committee meets on a quarterly basis, with meetings open to the public. For a listing of meetings and proceedings please visit the committee meeting page.
About Measure C
On June 6, 2006, voters in the district’s service area approved Measure C, a $490.8 million general obligation bond measure, enabling the district to:
- Upgrade electrical, heating, ventilation, and fire/seismic safety systems
- Repair leaky roofs
- Improve access for people with disabilities
- Repair/expand classrooms for nurses/paramedics
- Upgrade technology
- Repair, construct, acquire, and equip buildings, classrooms, libraries, sites, science/computer labs
Measure C Bond Expenditures
For Fiscal Year 2019-2020
| Location | Fiscal Year Expenditures | Program Expenditures to date |
|---|---|---|
| Foothill College | $1,826,846 | $200,019,058 |
| De Anza College | $1,399,084 | $210,906,674 |
| District | $1,006,588 | $97,138,940 |
| Total Bond Expenditures*: | $4,232,518 | $508,064,672 |
| *Rounding factors may apply Source Documents: Quarterly Summary Report - BoardDocs | ||
Featured Projects
Completed, occupied or put in use this fiscal year
Interior and Exterior Improvements (Registration & Student Services (RSS) Building) - De Anza College
Click for more information
New District Offices
Click for more information
Network Room Renovation - Foothill College
Click for more information
Irrigation Pump Replacement - Foothill College
Click for more information
Building 2500 Reroof - Foothill College
Click for more information
Parking and Circulation (Lot 5/6) - Foothill College
Click for more informationMeasure C Bond Project List
as of June 30, 2020
| Project Name | Program to Date Expenditures |
|---|---|
| Foothill College | |
| Furniture and Equipment (Excluding Tech Related Equipment) Foothill Furniture and non-technological equipment used in classroom and office environments to support educational goals and strategies. |
$11,342,650 |
| Expansion of Virtual Desktop Infrastructure (VDI) Servers Technological infrastructure needed to support and enhance the virtual and remote learning environment. |
$0 |
| Computer Equipment (Carts, Monitors) Supplementary equipment needed to deploy computers and associated equipment. |
$0 |
| Outdoor and Indoor Student Seating (Physical Sciences & Engineering Center Café, Buildings 5000, 5100, 5400, etc.) Improvement and establishment of outside seating areas located throughout the campus to facilitate student studying and collaborative group activities. |
$13,440 |
| Faculty/Staff/Administrator Office Refresh (Furniture) Enhance and update employee and shared office space furniture. |
$15,311 |
| Accommodation/Ergonomic Furniture & Equipment (Staff, Faculty and Administrators) Provide ergonomically correct office settings for employees. |
$0 |
| Classroom Furniture Replacement Enhance and update classroom environments to better meet current student needs. |
$35,717 |
| Desktops Upgrades to computer equipment for classrooms, labs and offices to provide optimum instructional and operational functionality. |
$6,121,571 |
| Printers Upgrades to printer equipment for classrooms, labs and offices to provide optimum instructional and operational functionality |
$82,325 |
| New Multimedia and Technology, and Refresh Enhance and update audio and visual equipment (i.e., projectors) in classroom environments. |
$3,913,133 |
| Accessibility Project for Classrooms and Labs (Counters, Tables, Desks, Chairs) Modifications to improve accessibility for students and staff . |
$0 |
| Instructional Equipment for Biological and Health Sciences Building, Fine Arts & Physical Education buildings Instructional equipment to support the Instructional programs within Biological & Health Sciences, Fine Arts & Physical Education. |
$145,041 |
| Campus Security Update security and electronic lock systems throughout the campus to improve functionality and safety. |
$40,247 |
| Parking and Circulation Review and reconfigure parking lots and traffic flow patterns to improve campus travel and safety. |
$13,414,358 |
| Building 1500 Renovation Improvements to the 1500 building located on the campus. |
$1,172,968 |
| Irrigation Pump Replacement Replace and update irrigation system to promote water conservation and enhance campus environment. |
$257,515 |
| Building 2500 Reroof Replace and upgrade the roof on the 2500 Building in the Physical Education area. |
$969,180 |
| Storage Building at Swim Pool Area Provide a secure storage facility for pool equipment. |
$536,837 |
| Small Capital Repairs - Foothill Various projects on campus to improve buildings, pathways and infrastrucure. |
$3,811,411 |
| Physical Education Building Reroofing Replace the roof on the Physical Education building area. |
$976,594 |
| Forum Improvements to the Forum building which houses both classrooms and student support programs. |
$3,912,855 |
| Modernization of Learning Support Center, Biology and General Classrooms Modernize and modify classrooms to support the instructional programs within the Learning Support Center, Biology and general classrooms. |
$16,203,253 |
| Modernization of Building 5700 Modernize and modify classrooms to support the instructional programs within Building 5700. |
$361,698 |
| Physical Education Lab Space Modernize and modify classrooms to support the instructional programs within the Physical Education Lab spaces. |
$1,512,408 |
| Language Arts General Classrooms Modernize and modify Language Arts classrooms. |
$3,064,580 |
| Swing Space Relocate staff and students to spaces being redeveloped during ongoing renovations. |
$965,079 |
| Modernization of Administration Building & General Classrooms Modernize and modify Administration Building and general classrooms. |
$7,132,515 |
| Reconstruction of Stadium Bleachers & Press Box Updates and accessibility improvements made to the Football Stadium at Foothill College. |
$1,816,465 |
| Fine Arts Scene Shop Perform updates and improvements to the dramatic arts area supporting the physical locations for productions. |
$767,347 |
| Japanese Cultural Center Enhancements and improvements made to the Japanese Cultural Center, a location used to facilitate understanding and appreciation of Japanese culture and customs. |
$120,234 |
| Renovate Existing Footbridge Update and improve accessibility of the existing pedestrian pathway bridge located near one of the main bus stops. |
$253,693 |
| Smithwick Theater Improvements and upgrades to the Smithwick Theater, used both for the dramatic arts instructional program as well as campus and district functions. |
$4,139,185 |
| Library & Instructional Support Center Renovation of the library and student instruction center to improve accessibility, shared spaces, infrastructure and technology with the goal of providing an effective and welcoming space for student use. |
$15,131,676 |
| Campus Wide Building System & Infrastructure Repairs/Upgrades Various projects on campus to improve systems supporting building functions and associated infrastrucure. |
$620,727 |
| Mainline Irrigation - Phase II Update mainline irrigation to promote water conservation and enhance campus environment. |
$158,942 |
| Utility Lids - Phase II Update manhole utility lids to improve utility access and campus safety. |
$572,116 |
| Loop Road Resurfacing Resurface perimeter roads to improve traffic flow for campus safety. |
$1,012,739 |
| Exterior Signage Update exterior signage across the campus to improve wayfinding. |
$351,451 |
| Utility and Technology Infrastructure Enhance and update utility and technology infrastructure. |
$8,515,900 |
| Exterior Painting & Bird Remediation Apply exterior paint and bird remediation strategies. |
$621,983 |
| Soccer and Softball Complex Update and improve both the soccer and softball sport complexes. |
$4,077,771 |
| Central Campus Site Improvements Various projects located throughout campus to improve functionality. and infrastructure |
$9,809,110 |
| Ornamental Horticulture & Veterinary Technology Demolition Removal of various structures related to the horticulture and veterinary programs that are no longer needed in support of the instructional programs. |
$182,567 |
| Choral Rehearsal Hall Audio and structural Improvements and renovations to the location utilized for singing and voice programs. |
$150,002 |
| Dental Hygiene/Radiology Renovation Improvements and renovations to upgrade the facilities to provide the most up-to-date equipment and classroom environment in support of the dental hygiene and radiology programs. |
$254,814 |
| Install Photovoltaic Arrays - Campus Wide Enhancement of the solar array infrastructure to better promote energy usage and sustainability. |
$11,738,853 |
| Physical Sciences and Engineering Center Construction of a facility to provide the most up-to-date equipment and classroom environment in support of the physical science and engineering programs at the campus. |
$57,627,320 |
| Group II Equipment Purchase of equipment needed to supplement various capital improvement projects. |
$1,073,647 |
| Fire Alarm System Replacements Phase II Improvement of campus fire alarm system to provide better response and corresponding safety measures for employees and students. |
$1,576,697 |
| Environmental Impact Report Report completed as part of bond project process to ensure that district remains in compliance with all required guidelines. |
$282,730 |
| Print Shop and Plant Services Facility Improvements to functionality of campus print shop and various facilities related to support of physical location. |
$287,833 |
| Fire Alarm System Replacement Phase III Improvement of campus fire alarm system to provide better response and corresponding safety measures for employees and students. |
$900,374 |
| Repair and Upgrade Miscellaneous Projects Funding for various projects across campus to improve functionality and service. |
$451,424 |
| Refresh Multimedia Rooms Update classroom audio and visual functionalities to better serve students and provide optimum instructional environments. |
$1,152,489 |
| Audio/Visual Technology Update audio and visual functionalities in classrooms and offices to better serve students and provide optimum instructional and office environments. |
$43,456 |
| Biology |
$0 |
| Convert to Adaptive Learning Center |
$0 |
| General Classrooms |
$0 |
| Language Laboratory |
$0 |
| General Classrooms |
$0 |
| Lot 2 & 3 Security Improvements |
$0 |
| Tennis Court Improvements |
$0 |
| TV Center |
$0 |
| Loop Road Lighting & Safety Upgrades and improvements to campus perimeter road to improve visibility and traffic flow to enhance campus safety. |
$11,033 |
| ADA Transition Plan Cohesive campus plan to improve accessibility and maintain compliance with ADA (Americans with Disabilities Act) requirements. |
$1,203 |
| Lot 4 |
$0 |
| Lot 6 Improvements located in parking lot 6 on the west side of campus |
$11,459 |
| Complete Lot 1H |
$0 |
| Exterior Lighting |
$0 |
| Campus Fountains |
$0 |
| Replace Storm Drains |
$0 |
| Tree Maintenance and Replacement |
$0 |
| Slurry Coat and Re-stripe Lots 2 & 3 |
$0 |
| Widen Access Road to Physical Education Building |
$0 |
| Replace Walkways Upgrade of sidewalks and other pathways on campus to improve accessibility and safety. |
$106,320 |
| Veterinary Technology |
$0 |
| Wireless Infrastructure |
$0 |
| Pedestrian Bridge Lot 1 |
$0 |
| Language Arts Division Office/Classrooms Classroom and office functionality improvements to provide better service to students and employees. |
$9,816 |
| Loop Road Re-Alignment & Pedestrian Safety Improvements Renovations to improve the traffic flow and visibility on the main perimeter road of the campus. |
$186,997 |
| Foothill Contingency |
$0 |
| Foothill College Total: | $200,019,058 |
| De Anza College | |
| Furniture and Equipment (excluding technology related equipment) De Anza Furniture and non-technological equipment used in classroom and office environments to support educational goals and strategies. |
$15,143,366 |
| Student Lab ADA Accessibility Project Various changes needed to bring the student computer labs to a consistent level of accessibility, with equipment needs ranging from tables to ADA height reception counters to desks. Completion timeline is dependent upon the scope of the work required. |
$4,031 |
| Furniture Refresh for Students, Faculty, Staff and Administrators Ongoing project to systematically refresh student/staff/faculty/administrative offices and other student use spaces on campus. Furniture purchases include but are not limited to desks, tables, chairs and cabinets. Timeline is ongoing through the remaining life of the bond. |
$555,042 |
| Outdoor Furniture Update and Refresh Refresh outdoor furniture that is significantly dated or no longer exists with more appropriate models that will better fit student needs as well as provide maintenance utility for the staff. Timeline is ongoing through the remaining life of the bond. |
$0 |
| System Wide Infrastructure Projects that provide campus-wide service and are an addition to the infrastructure provided for support of students, staff and faculty, such as a key management system. Timeline is identified as needed projects are identified and implemented. |
$0 |
| Desktops Upgrades to computer equipment for classrooms, labs and offices to provide optimum instructional and operational functionality. |
$9,172,583 |
| Printers Upgrades to printer equipment for classrooms, labs and offices to provide optimum instructional and operational functionality. |
$210,759 |
| Refresh Multimedia Rooms Enhance and update audio and visual equipment (i.e., projectors) in classroom environments. |
$3,375,396 |
| Interior and Exterior Improvements Enhancements to both inside and outside of campus buildings. |
$30,960 |
| Signage and Wayfinding Update exterior signs and pathways across the campus to improve pedestrian and vehicle traffic flow. |
$830,762 |
| Campus Wide Electronic Locks Standardize locking system across campus to provide more efficient functionality and improved safety features. |
$1,537,277 |
| Campus Drive Renovations to improve the traffic flow and visibility of the main perimeter road of the campus. |
$3,669,717 |
| Planetarium Roof Replacement Replacement of the roof on the Planetarium building on campus, including improvements related to specialized function. |
$84,340 |
| Small Capital Repairs - De Anza Various projects on campus to improve buildings, pathways and infrastrucure. |
$3,174,620 |
| L-7 Building Improvements to classrooms of the L-7 building on campus. |
$3,805,020 |
| Baldwin Winery & East Cottage "Historic Renovation" Renovations to two buildings on campus to both maintain historic features as well as improve classrooms and office functionality. |
$6,159,985 |
| Seminar Building & Multicultural Center Upgrades and improvements to two buildings on campus that provide instructional and student support services. |
$5,000,053 |
| Stadium and Track Upgrades and improvements to the campus stadium, including new turf and other features. |
$7,976,644 |
| L-Quad Seating Improvements to outside shared seating areas located near the east side of campus. |
$158,918 |
| Corporation Yard Upgrades to the office, conference room and work areas in the facilities building and work yard located at the De Anza campus. |
$4,008,793 |
| Signage (Phase I) Standardization and accessibility improvements to signs located on the campus to improve visitor and student experience. |
$671,069 |
| Library Renovation of the library building to improve accessibility, shared spaces, infrastructure and technology with the goal of providing an effective and welcoming space for student use. |
$11,152,379 |
| Secured Bicycle Storage for Students Construction of a locked bicycle storage area to allow for use of Associated Student Body provided bicycles to students with transportation needs. |
$227,117 |
| Campus Site Lighting (Phase I) Second phase of campus-side review and upgrade of lighting system to provide a better lighted and safer environment for employees and students. |
$662,686 |
| Campus Wide Replacement/Repair of Interior and Exterior Finishes Various projects to upgrade and replace both inside and outside building walls and structures. |
$1,259,670 |
| Window Replacement Campus-wide Campus-side review and upgrade of various windows to improve functionality and energy efficiency. |
$405,845 |
| Child Development Center Playground Maintenance & Shade Structure Replacement and upgrade of recreational structures used by the children who attend the child development center. |
$439,291 |
| Environmental Studies Area Improvements to the outside instructional area, including renovation of the pond, used by the environmental study program. |
$972,869 |
| Repair Tile Roofs Repair and upgrade of various tile roofs located on buildings throughout the campus. |
$5,293,951 |
| Flint Parking Structure Repairs Renovation and seismic upgrades made to the 4-story Flint parking structure to enable it to meet current regulatory guidelines. |
$6,946,144 |
| Buildings S2-S6 Phase II - Utility Master Plan - Phase I Upgrades to the utility infrastructure of the science quad location to enable better energy efficiency and support instructional needs specifically related to science curriculums. |
$14,822,225 |
| Advanced Technology Center Renovations and upgrades made to the Advanced Technology Center to provide up-to-date laboratories, equipment and classrooms for student instruction. |
$11,631,949 |
| G-Building Improvements and upgrades to the classrooms located near the football stadium. |
$962,243 |
| Install Photovoltaic Arrays - Campus Wide Installation of solar arrays in various locations throughout the campus to reduce reliance on traditional energy sources. |
$11,732,597 |
| Elevator Upgrades - Campus Wide Improvements to elevators across campus to ensure regulatory guidelines are met and student and employee accessibility is maintained at the highest level. |
$733,108 |
| Advanced Technology Center Central Plant Sound Attenuation Project to reduce the sound impact from infrastructure systems related to use of the Advanced Technology Center. |
$686,818 |
| Auto Technology Improvements and upgrades made to the location of the Auto Technology program to provide the most up-to-date learning experience. |
$4,064,329 |
| Campus Center Phase II Improvements to the Campus Center, a location that includes Dining Services, the Associated Student Body Offices, Health Center and conference rooms. |
$2,156,931 |
| Media & Learning Center Construction of a two-story media and learning center to better serve student needs. In alignment with the campus' sustainability goals, the building was constructed to meet LEED platinum (highest level) status. |
$49,972,863 |
| Group II Equipment Purchase of equipment needed to supplement various capital improvement projects. |
$1,900,378 |
| Swing Space Construction of space needed to house existing offices and programs during building renovations. |
$1,238,195 |
| Fire Alarm System Replacements Phase II Improvement of campus fire alarm system to provide better response and corresponding safety measures for employees and students. |
$284,997 |
| Forum Improvements to the Forum building which houses both classrooms and student support programs. |
$2,155,798 |
| Environmental Impact Report Report completed as part of bond project process to ensure that district remains in compliance with all guidelines. |
$43,233 |
| Roof and Trellis Repair: Buildings PE 1-2-6 & S7 - 8 Repairs to the exterior trellis and roofs of various athletic and science buildings. |
$1,562,017 |
| Combined Site Improvements Various projects located throughout campus to improve functionality and infrastructure. |
$8,580,539 |
| Building L-7 Phase II Second phase of improvements to the L-7 building on campus focused on data center components serving the entire district. |
$2,566,379 |
| Campus Exterior Lighting First phase of campus-side review and upgrade of lighting system to provide a better lighted and safer environment for employees and students. |
$553,579 |
| New Multimedia Technology, Then Refresh Enhance and update audio and visual equipment (i.e., projectors) in classroom environments. |
$2,102,269 |
| Audio/Visual Technology Improvements to more traditional audio and visual equipment used in the classroom environment. |
$17,683 |
| Physical Education Quad Breezeway |
$0 |
| Demolition of Staff House |
$0 |
| Wireless Infrastructure- Phase II & III |
$0 |
| Asphalt Walks |
$0 |
| East Cottage "Historic Renovation" |
$0 |
| Irrigation - Branches |
$0 |
| Landscaping Phase II |
$0 |
| Campus Exterior Lighting Phase II |
$0 |
| Resurface Parking Lots E & I |
$0 |
| Construct Parking Lot K |
$0 |
| Sunken Garden |
$0 |
| Slip Line Storm Drain Main Lines |
$0 |
| Repair Stone Pavers in Courtyards |
$0 |
| Slurry Seal Lots A, B, and Flint Center Parking Garage |
$0 |
| Building L5 Central Plant |
$0 |
| Baseball & Softball Fields |
$0 |
| ADA Transition Plan |
$0 |
| Construct New Covered Gathering Area |
$0 |
| Financial Aid Outreach Office |
$0 |
| Multicultural Center |
$0 |
| Planetarium Expansion |
$0 |
| Parking and Circulation |
$0 |
| A8 Building Improvements to the A8 building on campus which houses office space and serves as a technology infrastructure hub. |
$190,936 |
| Phase II - Renovation of A9 |
$0 |
| Master Landscaping (Phase I) |
$0 |
| Renovation of Administrative Offices Phase II |
$0 |
| Construct New Transit Center Construction of a more efficient and user-friendly mass transportation center primarily used by the county bus system. |
$18,319 |
| De Anza Program Contingency |
$0 |
| De Anza College Total: | $210,906,674 |
| District | |
| Phone Equipment Upgrade of district-wide phone system from traditional ground line to a "voice of Internet protocol" (VoIP) system. |
$2,297,540 |
| Consultants Specifications for Network Routers Improvements to technology infrastructure. |
$97,305 |
| Server Growth Expansion of technology infrastructure to support enhanced instructional and operational technology needs. |
$70,355 |
| Wireless Infrastructure - Phase II & III Expansion of technology infrastructure to support expanded and enhanced network connectivity across the district. |
$764,235 |
| Desktops Upgrades to computer equipment for classrooms, labs and offices to provide optimum instructional and operational functionality. |
$879,292 |
| Printers Upgrades to printer equipment for classrooms, labs and offices to provide optimum instructional and operational functionality. |
$28,243 |
| Educational Technology Services (ETS) Facilities Upgrade to technology office and administrative space that supports instructional, student service and administrative needs of the district. |
$1,324,732 |
| New District Offices Construction of a new office space to house the Chancellor's Office, Business Services Human Resources and Foundation department. Consolidation of these services in a modern building enhances support of instructional and student service functions on the campuses. |
$22,163,669 |
| Replace Enterprise Resources Program (ERP) Replacement of various instructional, business and student service software systems with a single integrated system that provides improved functionality and enhances the student experience. |
$10,584,942 |
| Enterprise Resources Program (ERP) Hardware Refresh Replacement and upgrade of the physical computer components needed to support the new ERP software system. |
$232,651 |
| Network Room Renovation Improvements to technology infrastructure to support enhanced needs of the district. |
$1,849,132 |
| Foothill-DeAnza Education Center Construction of new facility located in Sunnyvale to expand instructional services to student and better meet geographical needs. |
$41,020,934 |
| Network and Security Improvements to technology security infrastructure of the district. |
$4,722,637 |
| Labor to Refresh Computers Personnel costs to support the upgrade and improvements of computers for student laboratories and staff use. |
$2,292,077 |
| Labor to Install Network Equipment/Routers etc Personnel costs to support the upgrade and improvements of audio and visual equipment for classrooms and conference areas. |
$510,094 |
| Server Refresh Expansion of server infrastructure needed to support enhanced technology needs. |
$1,994,653 |
| Wireless Infrastructure Expansion of wireless infrastructure needed to support enhanced technology needs. |
$658,903 |
| District Vehicles Purchase of vehicles needed to support athletics, disability, custodial, grounds, trades and police functions. |
$3,194,909 |
| Group II Equipment Purchase of equipment needed to supplement various capital improvement projects. |
$522,600 |
| Pay Off Existing Loan |
$0 |
| Grounds and Landscaping |
$0 |
| Repairs & Resurfacing of Roads & Parking |
$0 |
| Data Center "C" Improvements to location housing district technology infrastructure. |
$128,415 |
| District Program Contingency |
$0 |
| District Program Contingency - Property Acquisition |
$0 |
| Pay Off Existing Debt |
$0 |
| Pass through Account for Overhead Collection |
$0 |
| Pass through Account for Furniture Equipment and Technology (FET) Overhead Collection |
$0 |
| Program Overhead |
$0 |
| Cost of Issuance/Other Expense related to the issuance of bonds for the support of the Measure C. program |
$1,801,622 |
| Unallocated Interest Earnings |
$0 |
| Catastrophic Contingency |
$0 |
| District Total Expenditures: | $97,138,940 |